Container Mobile Filling Station
video
Container Mobile Filling Station

Container Mobile Filling Station

The Container Mobile Filling Station integrates fuel storage and dispensing equipment within a containerized unit. It provides a centralized refueling solution for fleet operators, contractors, mining sites, and industrial facilities. Tank capacity, dispensing equipment, and safety systems can be configured according to the project requirements and destination-market regulations.
Send Inquiry
Product Details ofContainer Mobile Filling Station

Product Overview

 

The Container Mobile Filling Station integrates fuel storage and dispensing equipment within a containerized unit. It provides a centralized refueling solution for fleet operators, contractors, mining sites, and industrial facilities. Tank capacity, dispensing equipment, and safety systems can be configured according to the project requirements and destination-market regulations.

 

Technical Specifications

 

Parameter

Specification

Container Size

20-foot

External Dimensions

6058 × 2438 × 2591 mm

Tank Capacity

10,000–23,000 L

Tank Structure

Single-wall or double-wall

Tank Compartments

To be confirmed based on the selected configuration

Main Material

Q235B carbon steel

Fuel Dispenser

1 or 2 units

Nozzles

1 or 2 per dispenser

Fuel Piping

DN40 with protective housing

Level Gauge

Sight-glass or electronic

Electrical System

Power control box and cabling

Lighting

Explosion-proof lighting

Safety Equipment

Vent cap and static grounding unit; fire-suppression configuration to be confirmed

Surface Treatment

Grinding, derusting, degreasing, and three-layer anti-corrosion coating

 

Configurations & Customization

 

The following options can be selected according to project requirements:

Tank Structure: Single-wall or double-wall construction.
Dispensing Setup: One or two dispensers, with one or two nozzles per dispenser.
Level Monitoring: Sight-glass or electronic level gauge.
Fire Protection: Suspended fire-suppression system, subject to configuration and applicable requirements.
Additional Equipment: Fuel monitoring, metering, and other project-specific control or safety components.

The availability and cost of each option will be confirmed in the quotation. Final specifications and supply scope will be documented in the approved bill of materials (BOM).

 

3

 

Key Features & Benefits

 

Integrated Equipment Layout
Fuel storage and dispensing components are arranged within one containerized unit, helping simplify equipment coordination and site planning.

Configurable Storage and Dispensing
Tank structure, capacity, dispenser quantity, and monitoring options can be selected to match the required fuel-handling workflow.

Container-Based Construction
The enclosed container format consolidates the main station components into a defined unit for transport planning and site installation.

Accessible Operating Compartment
The equipment layout should provide suitable access for routine inspection and maintenance, subject to the final design.

 

31

 

Safety & Compliance

 

Available Safety Components
Breather Valve
Housing: cast aluminum alloy, lightweight, spark-resistant, and corrosion-resistant.
Flame arrester element: double-layer stainless steel mesh in 304 or 316 grade, for high-temperature resistance and flame arrestment.
Seals: fluororubber (Viton) or nitrile rubber, for oil resistance and temperature tolerance.

Fixed Combustible Gas Detection and Alarm
Local audible alarm with a flashing red warning light when gas concentration exceeds the set limit.
LED display showing concentration in PPM or LEL.
Separate indicator lights for Fault, Low Alarm, and High Alarm.
Relay output that can activate exhaust fans or emergency shut-off valves when limits are exceeded.

Certifications & Compliance
We hold CE, ATEX, IECEx, and UL certifications. Scanned copies of the relevant certificates are provided with your order. Certificate scope is confirmed against the selected equipment, destination market, and intended installation.

 

Applications

 

Mining & Remote Operations: On-site refueling for mining equipment, generators, and service vehicles where established fuel stations are not available.

Construction Projects: Fuel supply for highway construction, infrastructure sites, and commercial concrete plants.

Fleet & Logistics: Refueling for logistics parks, freight fleets, and bus depots. Dispenser quantity is selected according to fleet size and daily fuel demand.

Industrial Facilities: A designated fuel storage and dispensing point for factories and port terminals.

Emergency & Field Use: Temporary fuel supply for disaster relief, oil and gas exploration, and field construction sites.

 

Manufacturing & Quality Control

 

Material & Fabrication Records
Steel grades, wall thicknesses, and welding requirements are stated in the technical documents. Material certificates are available on request.

Welding & Tank Inspection
Weld inspections, tank leak tests, and pressure tests where required. Test methods and acceptance criteria follow the approved design and relevant standards.

Equipment & Electrical Checks
Pump operation, dispenser and meter function, control-panel wiring, grounding continuity, and alarm functions are checked where these components are included.

Pre-Shipment Testing & Inspection
Testing covers pressure resistance, explosion-proof performance, and function. Production progress can be tracked after order confirmation, and inspection can be carried out by video link or by a third party such as SGS or BV. Hold points and required test records are agreed before production and written into the contract.

 

Installation, Packaging & Shipping

 

Site Preparation
Confirm the installation area, foundation or support requirements, access clearance, and applicable site approvals before delivery.

Lifting & Unloading
Lifting points, equipment weight, center of gravity, and unloading arrangements should be confirmed before dispatch. Use suitable lifting equipment and follow the approved lifting instructions.

Utility Connections
Confirm required power supply, grounding arrangements, and site connections against the approved drawings.

Export Packaging & Shipping
Packaging and securing methods should be selected according to the shipping route and transport mode. Confirm overall dimensions, gross shipping weight, loading arrangements, and shipping documents before dispatch.

 

32

 

FAQ

 

Q: What information do you need to prepare a quotation?

A: Fuel type, required storage volume, number of dispensers and nozzles, site dimensions, local voltage, climatic conditions, and destination country. We reply within 24 hours.

Q: How is the price calculated?

A: Price depends on tank capacity, equipment configuration, customization, certification requirements, order quantity, and delivery terms.

Q: What is the minimum order quantity (MOQ)?

A: MOQ depends on the model and customization scope. Single-unit orders are available for project evaluation.

Q: What is the typical lead time?

A: Around 30–50 days after deposit receipt and technical drawing approval, depending on configuration, component availability, and order quantity.

Q: How is the unit packed for export?

A: With protective wrapping, surface protection, shock-resistant packaging, and securing measures for transport.

Q: Can replacement parts be shipped urgently?

A: Yes, by air freight. Packing time, freight cost, and transit time depend on the parts and destination.

Q: What is the warranty period?

A: 12 months for the complete station and 18 months for the core pump assembly and explosion-proof motor. Terms and exclusions are set out in the sales contract.

Hot Tags: container mobile filling station, China container mobile filling station manufacturers, suppliers, factory, Container Mobile Filling Station, Diesel Mobile Fuel Station, Emergency Mobile Fuel Station, mobile fuel station, Mobile Fuel Station for Construction, Mobile Gas Container Filling Station

Send Inquiry

(0/10)

clearall